Issues on Code for Design and Construction of Steel Structures
Release time:2020/3/18 14:54:43      The number of clicks:1035

Some problems and solutions during the construction of steel structures

1. Production and production of components

The gantry steel frame is thin and can be as thin as 4 mm. Cutting of multiple sheets should be selected to avoid cutting with flame. Because cutting with flame will cause a large wave deformation of the board edge. At present, most manufacturers of H-beam welding use submerged arc welding or semi-automatic welding. If the control is not good, welding deformation should occur, and the component will be bent or twisted.

2, column foot installation problem

(1) Problems with embedded parts (anchor bolts): overall or layout deviation; incorrect elevation; no protective measures have been taken for wire fasteners. The bolt holes of the bottom plate of the steel column are directly misaligned, resulting in insufficient length of the thread fastener.

Measures: The steel structure construction unit cooperates with the civil construction unit to complete the work of embedded parts, before the concrete is poured. Relevant dimensions must be reviewed and firmly secured.

(2) Anchor bolts are not vertical: The horizontality of the foot of the frame column is poor, the anchor bolts are not vertical, and the horizontal error of the embedded anchor bolts after the foundation is large. The pillars are not in a straight line after installation, and they are crooked from east to west, which makes the appearance of the house difficult to see, which brings errors to the installation of the steel columns, the structure is affected by force, and does not meet the requirements of the construction acceptance code.

Measures: Anchor bolts should be installed by first leveling the bottom plate with the lower adjusting bolts and then filling them with non-shrinking mortar for secondary grouting. This method is used abroad. Therefore, anchor bolts can be used for fixing anchor bolts such as steel bars or angle steel. Welded into a cage, perfect support, or take some other measures to avoid moving the anchor bolt one bit when pouring the foundation concrete.

(3) Anchor bolt connection problem phenomenon: The column anchor bolt is not tightened, and the backing plate is not welded to the bottom plate; part of the anchor bolt is not exposed with 2 to 3 wire buckles.

Measures: Welding anchor rods and nuts should be adopted; outside the chemical anchor bolts, thicker fire-resistant coatings and heat insulation treatments should be used to prevent the anchoring performance from being affected in the event of a fire; additional observation data for foundation settlement should be added.

3. Connection problems

(1) High-strength bolt connection

1) The bolt equipment surface does not meet the requirements, which makes the bolts difficult to install, or the degree of bolt tightening does not meet the design requirements.

Cause Analysis:

① There are impurities such as floating rust and oil stain on the surface, and there are burrs and welding knobs on the bolt holes.

② Although the bolt mounting surface is still lacking after treatment.

Solution:

① The surface of high-strength bolts should be cleaned one by one if they have rust, oil stains, and bolt holes. Before use, it must be rust-proofed, so that the bolts used for assembly must not be used in the formal assembly. Bolts should be kept and distributed by a special person.

② When handling the assembly surface, consideration should be given to the order of construction and installation to prevent repetition, and try to handle it before lifting.

2) The bolt screw is damaged, and the screw cannot be screwed into the nut, which affects the assembly of the bolt.

Cause analysis: The wire buckle was severely rusted.

Solution:

① Bolts should be selected before use, and pre-configured after cleaning and rust removal.

② Bolts damaged by wire buckles cannot be used as temporary bolts, and it is strictly forbidden to force them into the screw holes.

③ The pre-selected bolt assemblies should be stored according to sleeves, and they should not be interchanged when in use.

(2) On-site welding seam phenomenon: It is difficult to guarantee the quality; the first and second grade welding seams which are designed to be fully welded are not used for inspection; the main beams and columns of the floor are not welded; arc welding plates are not used for welding.

Solution: Before welding the steel structure, check the qualification certificate of the electrode, select the welding rod according to the design requirements, use the electrode according to the instructions and operating procedures, and there should be no cracks or nodules on the surface of the weld. There must be no pores, slag inclusions, arc pit cracks, welds must not have undercuts, underfilled welds, etc., non-destructive testing of primary and secondary welds according to requirements, the welder's stamp should be checked at the specified welds and parts. Unqualified welds shall not be processed without authorization. After the modification process is determined, the welds shall not be repaired more than twice.

4.Deformation of components

(1) When the component is deformed during transportation, dead bends or slow bends occur, making the component unable to be installed.

Cause Analysis:

1) Deformation due to welding during the production of components generally shows a gentle bend.

2) When the component is ready for transportation, the support points are unreasonable. For example, if the upper and lower dunnages are not vertical, or the storage site is subsided, the component will be dead bent or slowly deformed.

3) Deformation due to collision during transportation of components, generally showing dead bends.

Precaution:

1) When manufacturing components, measures to reduce welding deformation are adopted.

2) During assembly and welding, measures such as deformation in the opposite direction are adopted. The assembly sequence should obey the welding sequence. Use assembly tires and set enough brackets to prevent deformation.

3) During transportation and transportation, pay attention to the reasonable allocation of pads.

Solution:

1) Dead bending of members, mechanical correction is generally adopted. Correction with jack or other tools or supplementation with oxyacetylene flame

2) When the structure is deformed slowly, oxyacetylene flame heating is adopted to correct it.

(2) The total length of the steel beam members after assembly is distorted beyond the allowable value, resulting in poor installation quality of the steel beam.

Cause Analysis:

1) The splicing process is unreasonable.

2) The dimensions of the assembled nodes do not meet the design requirements.

Solution:

1) Assembling components should be equipped with assembly tables. When welding is set, the bottom surface of the components should be leveled to prevent warping. The fulcrum of the assembly table should be level, and welding deformation should be prevented during group welding. Especially for the assembly of beam sections or stairways, it is necessary to adjust the deformation after tack welding, and pay attention to the size of the joints in accordance with the design, otherwise it is easy to cause component distortion.

2) Components with poor rigidity should be reinforced before turning over and welding, and leveling should also be performed after turning over, otherwise the components cannot be corrected after welding.

(3) The element is arched, and the value is large or smaller than the design value. When the arch value of the component is small, the beam is deflected after installation; when the arch value is large, the extrusion surface elevation is likely to exceed the standard.

Cause Analysis:

1) The dimensions of the components do not meet the design requirements.

2) During the erection process, the measured and calculated values are not used.


You are interested in the news
Previous:How long can steel structure works
Next:Grid-framed buildings are a good form of construction

Back to list

主站蜘蛛池模板: 欧美一区二区三区四区夜夜大片| 老女人伦理hd| 激情久久久久久| 窝窝午夜精品一区二区| 国产精品视频一区二区在线观看 | 亚洲欧美国产精品久久| aaaaa国产欧美一区二区| 色一情一乱一乱一区免费网站| 中文字幕一区二区三区乱码视频| 欧美日韩久久精品| 欧美性受xxxx狂喷水| 国产午夜精品一区| 欧美在线观看视频一区二区| 国产午夜三级一区二区三| 国产品久精国精产拍| 欧美综合国产精品久久丁香| 欧美日韩一区二区三区在线播放| 国产一区二区免费电影| 少妇厨房与子伦在线观看| 国产盗摄91精品一区二区三区| 久精品国产| 国产精品一区二区av日韩在线| 国产精品一二三在线观看| 91狠狠操| 91久久综合亚洲鲁鲁五月天| 国产精品日本一区二区不卡视频 | 麻豆国产一区二区| 欧美日韩三区二区| 国产亚洲久久| 高清欧美精品xxxxx| 色吊丝av中文字幕| 国产精品久久国产精品99| 国产欧美日韩二区| 欧美一区二区精品久久| 国产精彩视频一区二区| 精品国产乱码久久久久久图片| 国产欧美日韩亚洲另类第一第二页| 国产精品高潮呻吟三区四区 | 久久99视频免费| 欧美日韩偷拍一区| 香港日本韩国三级少妇在线观看| 搡少妇在线视频中文字幕| 91超薄丝袜肉丝一区二区| 国产精品国产三级国产播12软件| 亚洲欧美精品suv| 国产美女三级无套内谢| 欧美国产一区二区在线| 一区二区中文字幕在线观看| 国产乱人乱精一区二视频国产精品 | 国产精品日产欧美久久久久| 欧美一区二区三区久久综合| 日本一区二区三区免费视频| 91精品国产综合久久国产大片 | 美国三级日本三级久久99| 久久精视频| 欧美一级免费在线视频| 亚洲少妇一区二区三区| 丰满少妇高潮惨叫久久久| 国产区精品区| 四季av中文字幕一区| 日本一二三区视频在线| 中文字幕在线播放一区| 欧美乱妇在线视频播放| 免费精品99久久国产综合精品应用| 毛片大全免费看| 国产精品黑色丝袜的老师| 好吊色欧美一区二区三区视频 | 日韩精品免费一区二区在线观看| 欧美日韩国产精品一区二区 | 国产精品综合在线观看| 欧美日韩卡一卡二| 欧美一区二三区| 午夜剧场一级片| 热re99久久精品国99热蜜月| 国产亚洲久久| 17c国产精品一区二区| 亚洲精品一品区二品区三品区| xxxx在线视频| 亚洲网久久| 国产精品6699| 亚洲精品性| 国产香蕉97碰碰久久人人|