      Issues on Code for Design and Construction of Steel Structures
      Release time:2020/3/18 14:54:43      The number of clicks:1078

      Some problems and solutions during the construction of steel structures

      1. Production and production of components

      The gantry steel frame is thin and can be as thin as 4 mm. Cutting of multiple sheets should be selected to avoid cutting with flame. Because cutting with flame will cause a large wave deformation of the board edge. At present, most manufacturers of H-beam welding use submerged arc welding or semi-automatic welding. If the control is not good, welding deformation should occur, and the component will be bent or twisted.

      2, column foot installation problem

      (1) Problems with embedded parts (anchor bolts): overall or layout deviation; incorrect elevation; no protective measures have been taken for wire fasteners. The bolt holes of the bottom plate of the steel column are directly misaligned, resulting in insufficient length of the thread fastener.

      Measures: The steel structure construction unit cooperates with the civil construction unit to complete the work of embedded parts, before the concrete is poured. Relevant dimensions must be reviewed and firmly secured.

      (2) Anchor bolts are not vertical: The horizontality of the foot of the frame column is poor, the anchor bolts are not vertical, and the horizontal error of the embedded anchor bolts after the foundation is large. The pillars are not in a straight line after installation, and they are crooked from east to west, which makes the appearance of the house difficult to see, which brings errors to the installation of the steel columns, the structure is affected by force, and does not meet the requirements of the construction acceptance code.

      Measures: Anchor bolts should be installed by first leveling the bottom plate with the lower adjusting bolts and then filling them with non-shrinking mortar for secondary grouting. This method is used abroad. Therefore, anchor bolts can be used for fixing anchor bolts such as steel bars or angle steel. Welded into a cage, perfect support, or take some other measures to avoid moving the anchor bolt one bit when pouring the foundation concrete.

      (3) Anchor bolt connection problem phenomenon: The column anchor bolt is not tightened, and the backing plate is not welded to the bottom plate; part of the anchor bolt is not exposed with 2 to 3 wire buckles.

      Measures: Welding anchor rods and nuts should be adopted; outside the chemical anchor bolts, thicker fire-resistant coatings and heat insulation treatments should be used to prevent the anchoring performance from being affected in the event of a fire; additional observation data for foundation settlement should be added.

      3. Connection problems

      (1) High-strength bolt connection

      1) The bolt equipment surface does not meet the requirements, which makes the bolts difficult to install, or the degree of bolt tightening does not meet the design requirements.

      Cause Analysis:

      ① There are impurities such as floating rust and oil stain on the surface, and there are burrs and welding knobs on the bolt holes.

      ② Although the bolt mounting surface is still lacking after treatment.

      Solution:

      ① The surface of high-strength bolts should be cleaned one by one if they have rust, oil stains, and bolt holes. Before use, it must be rust-proofed, so that the bolts used for assembly must not be used in the formal assembly. Bolts should be kept and distributed by a special person.

      ② When handling the assembly surface, consideration should be given to the order of construction and installation to prevent repetition, and try to handle it before lifting.

      2) The bolt screw is damaged, and the screw cannot be screwed into the nut, which affects the assembly of the bolt.

      Cause analysis: The wire buckle was severely rusted.

      Solution:

      ① Bolts should be selected before use, and pre-configured after cleaning and rust removal.

      ② Bolts damaged by wire buckles cannot be used as temporary bolts, and it is strictly forbidden to force them into the screw holes.

      ③ The pre-selected bolt assemblies should be stored according to sleeves, and they should not be interchanged when in use.

      (2) On-site welding seam phenomenon: It is difficult to guarantee the quality; the first and second grade welding seams which are designed to be fully welded are not used for inspection; the main beams and columns of the floor are not welded; arc welding plates are not used for welding.

      Solution: Before welding the steel structure, check the qualification certificate of the electrode, select the welding rod according to the design requirements, use the electrode according to the instructions and operating procedures, and there should be no cracks or nodules on the surface of the weld. There must be no pores, slag inclusions, arc pit cracks, welds must not have undercuts, underfilled welds, etc., non-destructive testing of primary and secondary welds according to requirements, the welder's stamp should be checked at the specified welds and parts. Unqualified welds shall not be processed without authorization. After the modification process is determined, the welds shall not be repaired more than twice.

      4.Deformation of components

      (1) When the component is deformed during transportation, dead bends or slow bends occur, making the component unable to be installed.

      Cause Analysis:

      1) Deformation due to welding during the production of components generally shows a gentle bend.

      2) When the component is ready for transportation, the support points are unreasonable. For example, if the upper and lower dunnages are not vertical, or the storage site is subsided, the component will be dead bent or slowly deformed.

      3) Deformation due to collision during transportation of components, generally showing dead bends.

      Precaution:

      1) When manufacturing components, measures to reduce welding deformation are adopted.

      2) During assembly and welding, measures such as deformation in the opposite direction are adopted. The assembly sequence should obey the welding sequence. Use assembly tires and set enough brackets to prevent deformation.

      3) During transportation and transportation, pay attention to the reasonable allocation of pads.

      Solution:

      1) Dead bending of members, mechanical correction is generally adopted. Correction with jack or other tools or supplementation with oxyacetylene flame

      2) When the structure is deformed slowly, oxyacetylene flame heating is adopted to correct it.

      (2) The total length of the steel beam members after assembly is distorted beyond the allowable value, resulting in poor installation quality of the steel beam.

      Cause Analysis:

      1) The splicing process is unreasonable.

      2) The dimensions of the assembled nodes do not meet the design requirements.

      Solution:

      1) Assembling components should be equipped with assembly tables. When welding is set, the bottom surface of the components should be leveled to prevent warping. The fulcrum of the assembly table should be level, and welding deformation should be prevented during group welding. Especially for the assembly of beam sections or stairways, it is necessary to adjust the deformation after tack welding, and pay attention to the size of the joints in accordance with the design, otherwise it is easy to cause component distortion.

      2) Components with poor rigidity should be reinforced before turning over and welding, and leveling should also be performed after turning over, otherwise the components cannot be corrected after welding.

      (3) The element is arched, and the value is large or smaller than the design value. When the arch value of the component is small, the beam is deflected after installation; when the arch value is large, the extrusion surface elevation is likely to exceed the standard.

      Cause Analysis:

      1) The dimensions of the components do not meet the design requirements.

      2) During the erection process, the measured and calculated values are not used.


      You are interested in the news
      Previous:How long can steel structure works
      Next:Grid-framed buildings are a good form of construction

      Back to list

      主站蜘蛛池模板: 国产一级片大全| 99久久国产综合精品麻豆| 国产一区日韩精品| 国产69精品久久久久久野外| 亚洲第一区国产精品| 国精偷拍一区二区三区| 国产精品一二二区| 国产一区日韩在线| 99国产精品九九视频免费看| 26uuu亚洲电影在线观看| 国产精品18久久久久白浆| 国产国产精品久久久久| 99久久精品免费看国产交换| 国产清纯白嫩初高生视频在线观看| 久久99精品国产麻豆宅宅| 亚洲精品乱码久久久久久国产主播| 欧美一区二区三区四区五区六区| 精品综合久久久久| 欧美亚洲精品一区二区三区| 91看片app| 日韩精品免费一区二区中文字幕| 国产日韩麻豆| 国产精品18久久久久白浆| aaaaa国产欧美一区二区| 欧美在线一区二区视频| 狠狠色狠狠色综合久久第一次| 国产欧美精品久久| 99精品小视频| 精品久久久久一区二区| 亚洲无人区码一码二码三码| 97久久超碰国产精品红杏| 99精品视频一区| 日本不卡精品| 欧美3级在线| 色乱码一区二区三在线看| freexxxx性| 狠狠色噜噜狠狠狠狠| 亚洲欧美国产一区二区三区| 99精品国产一区二区三区不卡| 久久夜靖品2区| 精品一区二区三区视频?| 日本少妇高潮xxxxⅹ| 国产精品亚州| 国产99视频精品免视看芒果| 亚洲欧美一卡| 99re国产精品视频| 亚洲国产精品日本| 日韩免费一级视频| 欧洲在线一区二区| 国产香蕉97碰碰久久人人| 97视频久久久| 国产精品一二三区免费| 国产伦高清一区二区三区| 精品国产乱码久久久久久虫虫| 狠狠色噜狠狠狠狠| 亚洲国产日韩综合久久精品| 精品91av| 精品一区二区三区影院| 国产色99| 国产精品影音先锋| 中文在线一区二区三区| 久久午夜鲁丝片| 亚洲欧美日本一区二区三区 | 99久久国产免费,99久久国产免费大片| 美女销魂免费一区二区| 香蕉视频在线观看一区二区| 中文字幕一区二区三区四| 久久二区视频| 中文字幕制服狠久久日韩二区 | 性欧美激情日韩精品七区| 久久国产麻豆| 午夜一二区| 成年人性生活免费看| 狠狠躁日日躁狂躁夜夜躁av| 国产床戏无遮挡免费观看网站| 日韩精品一区二区av| 国产精品久久久区三区天天噜| 99精品国产99久久久久久97| 日本免费电影一区二区| 99久久精品一区字幕狠狠婷婷 | 国产精品自产拍在线观看桃花| 26uuu亚洲电影在线观看| 国产精品久久久久久久龚玥菲| 午夜激情在线| 国产精品日产欧美久久久久| 国产乱人伦偷精品视频免下载| 国产精品一区二区日韩新区| 亚洲欧美另类综合| 欧美日韩一区二区三区四区五区 | 国产精品自拍不卡| 免费a级毛片18以上观看精品| 国产精品久久久麻豆| 欧美一区二三区人人喊爽| 国产目拍亚洲精品区一区| 91av一区二区三区| 国产精品视频99| 中文在线√天堂| 国内少妇自拍视频一区| 欧美乱妇高清无乱码免费| 国产精品高潮呻吟视频| 日本激情视频一区二区三区| 少妇高清精品毛片在线视频| 亚洲s码欧洲m码在线观看| 欧美二区在线视频| 日韩av免费网站| 久久91久久久久麻豆精品| 精品久久香蕉国产线看观看gif| 国产69精品久久久久男男系列| 91精品一区在线观看| 欧美精品久| 亚洲制服丝袜在线| 欧美精品第一区| 国产在线欧美在线| av毛片精品| 美日韩一区| 国产精品一区二区av日韩在线 | 国产精品久久免费视频在线| 视频一区欧美| 国产性生交xxxxx免费| 欧美激情精品一区| 中文乱幕日产无线码1区| 亚洲精品一区,精品二区| 国产欧美一区二区三区免费看| 精品久久二区| 国产日韩欧美色图| 国产一区二区视频免费观看| 97人人添人人爽一区二区三区| 日韩精品999| 国产一a在一片一级在一片 | 国产在线精品一区二区在线播放| 国产精品一区久久人人爽| 韩日av一区二区三区| ass美女的沟沟pics| 午夜黄色网址| 色噜噜狠狠色综合中文字幕| 国产超碰人人模人人爽人人添| 亚洲第一天堂无码专区| 女女百合互慰av| 日本一区二区三区中文字幕| 国产日韩欧美精品一区二区| 久久影视一区二区| 国产精选一区二区| 夜夜躁日日躁狠狠躁| 国产欧美精品一区二区三区-老狼| 久久99精| 国产午夜三级一区二区三 | 欧洲精品一区二区三区久久| 午夜激情在线播放| 久久久久国产精品视频| 欧美精品xxxxx| 亚洲午夜精品一区二区三区| 欧美日韩亚洲三区| 欧美在线播放一区| 国内久久久| 国产精品99一区二区三区| 伊人av综合网| 99精品区| 国产69精品久久久久孕妇不能看 | 亚洲国产午夜片| 99精品国产免费久久| 精品欧美一区二区在线观看| 午夜免费av电影| 久久99精品国产麻豆宅宅| 日韩精品免费一区二区在线观看| 国产精品久久久综合久尹人久久9| 麻豆国产一区二区三区| 日韩一区免费| 精品国产乱码久久久久久虫虫| 欧美日韩国产午夜| 国产欧美日韩中文字幕| 亚洲第一天堂久久| 午夜精品99| 中文字幕日韩有码| 午夜激情在线| 国产另类一区| 2023国产精品久久久精品双| 国产精品综合在线| 国产精品自拍不卡| 99国产精品9| 91亚洲欧美日韩精品久久奇米色| 国产一区www| 538国产精品| 免费超级乱淫视频播放| 狠狠插狠狠插| 黄色香港三级三级三级| 午夜影院黄色片| 国产精品不卡一区二区三区| 91精品啪在线观看国产| 国产一区日韩一区| 国产一区2| 色婷婷综合久久久久中文| 日韩一区二区福利视频| 天堂av色婷婷一区二区三区| 色一情一交一乱一区二区三区| 欧美一级久久久| 国产偷久久一区精品69| 国产精自产拍久久久久久蜜| 色噜噜狠狠色综合中文字幕 | 国产精品久久久久久一区二区三区| 国产一区二区高潮| 日本三级韩国三级国产三级| 国产精品久久久av久久久| 久久人人爽爽| 91亚洲欧美强伦三区麻豆| 右手影院av| 狠狠色噜噜狠狠狠888奇米| 欧美精品五区| 国产精品入口麻豆九色| 丰满少妇高潮惨叫久久久一| 免费a级毛片18以上观看精品| 韩漫无遮韩漫免费网址肉| 日韩午夜三级| 国产一区二区三区乱码| 国产88av| 国产一区精品在线观看| 亚洲精品性| 高清国产一区二区| 亚洲欧美日韩另类精品一区二区三区| 中文字幕日韩一区二区| 91国偷自产一区二区介绍| 日韩av免费电影| 国产88av| 激情久久久| 国产精品一区二区三| 亚洲少妇一区二区三区| 中文字幕一区二区三区免费视频| 久久免费视频99| 国产真实一区二区三区| 亚洲午夜精品一区二区三区电影院| 久久夜色精品亚洲噜噜国产mv| 久久夜色精品国产亚洲| 午夜一二区| 国产精品你懂的在线| 欧美系列一区二区| 国产一级不卡毛片| 亚洲国产精品一区二区久久,亚洲午夜| 国产日产精品一区二区| 97精品国产aⅴ7777| 夜夜夜夜夜猛噜噜噜噜噜gg| 国产精品尤物麻豆一区二区三区| 狠狠色综合久久婷婷色天使 | 国产麻豆精品一区二区| 99国产精品免费观看视频re| 97视频久久久| 色偷偷一区二区三区| 久久精品视频偷拍|